Skip To Content

TitleOil sand tailings integrated planning to provide long-term stabilization
Publication TypeConference Paper
Year of Publication1977
AuthorsDevenny, D. W.
Pagination20 pages
Date Published08/1977
Place PublishedEdmonton, AB
Publication Languageeng
Keywordserosion, erosion control, planning, reclamation methodology, tailings
Abstract

Processing oil sand involves material handling on an unprecedented scale, and creates vast quantities of waste or tailings. Large retaining structures are constructed from the sand tailings and used to retain the finer-grained waste products. The retaining structure must remain intact during construction and resist erosion until protective vegetation is established, support the fine-grained waste product until they consolidate and are able to stand by themselves, and erode at a controlled rate that avoids release of large quantities of sand into the surrounding area. Present construction methods appear adequate for short-term stability considerations, but the support will succumb to rapid natural erosion by running water and wind and not meet long-term stability requirements. Alternate construction methods that are more likely to meet long-term stability requirements include accelerating consolidation of the fines, controlling surface runoff even while the overall structure is eroding, and introducing barriers to prevent rapid erosion of the sand.

Notes

IN: Proceedings of the Second Annual General Meeting of the Canadian Land Reclamation Association. August 17-20, 1977. Edmonton, Alberta. Paper No. 9. 20 pp.

Locational Keywords

Alberta oil sands

Active Link

http://www.worldcat.org/oclc/4434447246

Group

OSEMB

Citation Key53046

Enter keywords or search terms and press Search

Search this site


Subscribe to the site

Syndicate content

Bookmark and Share